• 201, 17205 106A Avenue NW, Edmonton, AB T5S 1M7
  • 780-482-2557
  • services@sameng.com
Category: Water Resources Engineering
22 June 2016 - 9:17, by , in Front Page Slider, Water Resources Engineering, Comments off
The Gordey Drainage Project is located in the Municipal District of Greenview No. 16 (MD), approximately 22 kilometers east of the Town of Valleyview. The purpose of the project was to mitigate flooding and erosion resulting from a series of small watercourses from a drainage basin with relatively steep slopes. The project drains into Sweathouse...
21 June 2016 - 14:10, by , in Front Page Slider, Water Resources Engineering, Comments off
Sameng Inc. prepared the detailed designs, prepared required environmental approval documentation and provided construction engineering services for a slope stabilization  project in the Buffalo Lake Water Management System area. This system was constructed in the mid to late 1980s and was designed to convey water from the Red Deer River to Buffalo Lake before returning...
21 June 2016 - 13:30, by , in Front Page Slider, Water Resources Engineering, Comments off
The Pinnacle Ridge storm outfall is located along the north shore of Sturgeon River, just east of Starky Road. Drainage from the Pinnacle Ridge subdivision is collected by storm sewers and conveyed to this storm outfall, constructed in 2004. The existing outfall was freezing in winter causing surface flooding in the subdivision especially during spring runoff...
21 June 2016 - 10:36, by , in Front Page Slider, Water Resources Engineering, Comments off
The County of Vermilion River is located in eastern Alberta, just west of the City of Lloydminster and  contiguous to the Alberta /Saskatchewan border. Substantial industrial and residential growth has resulted in development pressures within the County and particularly in the areas surrounding the City of Lloydminster, which are in the Blackfoot and Devonia Drainage...